Electrical Grid Impact Study of 4.5 MWp Solar Power Plant at PT Indocement Tunggal Perkasa
Project year: 2023
This electrical grid impact study is assigned by PT Greenova Daya Prima. The grid impact study aims to analyze the grid impact factor for each interconnection after the 4.5 MWp solar power plant is connected to the existing power distribution system at PT Indocement Tunggal Perkasa. The scope of work includes power flow study, short circuit study, dynamic study, protection coordination study, and harmonic study.